top of page

Proven Performance on High-Consequence Projects

NAE Contracting provides a full range of construction services for federal, defense, municipal, and educational clients.  Our Core Processes -- assembling the right team, creating realistic schedules, communicating clearly, and tackling obstacles head-on-- are designed to deliver projects safely, on time, and within budget.

​

Our team has successfully delivered projects for:

​​

  • U.S. Army Corps of Engineers -- (Multiple North Texas facilities)

  • NASA – (Kennedy Space Center, Launch Pad B Electrical Upgrades)

  • Defense Information Systems Agency -- (Mission-critical Data Center Upgrades)

  • Sheppard and Altus Air Force bases -- (MACC Contracts and Task Orders)

  • Lockheed Martin Aeronautics – (F-35 Production Facilities)

  • Multiple Texas School Districts -- (Huckabay ISD, Alvord ISD, Peaster ISD, Springtown ISD, Mineral Wells ISD, Castleberry ISD, Garner ISD, and Poolville ISD)

​

​

The portfolio found below highlights selected projects representing our experience in mission-critical environments, occupied campuses, and challenging infrastructure upgrades:

​

​

Sheppard AFB

MACC Contract

​Contract/PO #

FA302023R006

​

Type

Design Build/Construction

​

NAE Contracting was awarded as one of the successful general contractors into the Sheppard AFB MACC with a contract size of $150,000,000.00 over a 5-year period. Construction projects consist of Design-Build as well as Ground-Up construction, interior remodeling, and heavy industrial work construction projects.  Seed project  (renovation of Base Instructional Theater) completed in 2025.  Additional projects recently awarded are ongoing.

Garner ISD

Roof and HVAC Replacement Project

​Contract/PO #

​​

Type

Construction

​

In response to significant hail damage, NAE Contracting coordinated a multi-trade proposal to replace damaged roofing materials on every building in the District, as well as repair and/or replace more than a dozen rooftop HVAC units.

United States Army corps of engineers

Lewisville Lake Recreational Repairs

​Contract/PO #

W9126G18C0084

​

Type

Design Build/Construction

​

Road and Parking Lot Repairs and Repaving. New asphalt overlay, Striping, Seal Coat, Chipseal. 6,000 LF of new site built pipe rail fence. Design and construct of new electrical distribution system for RV sites.

Defense Supply center

Replace Underground MV Electrical Utility Feeders

​Contract/PO #

SP4702-18-R-0519

​

Type

Construction

Removing 60,000 LF of primary 15KV cable for DLA Base facilities. We also provided and installed (2) new 15KV feeds through existing manholes and duct bank back to where old was removed. 15KV cables were pulled through manholes with energized cabling in them, all feeders were tested and terminated to specifications. Project required coordinated outages for both demolition and installation. Worked with base on road closures as well as minimizing impact of occupied space.

Lockheed Martin Aeronautics

Refurbish Mezz 11 for F-35 Production Office Building 004 - Floor 2

​Contract/PO #

6574019514

​

Type

Construction

​

Refurbishment of Mezzanine 11 in Building 004 Floor 2. Located directly off of Lockheed Martins F-35 Assembly Line. Cricitical Schedule Project or 10,000 SQ feet of office refurbishment in a 90 Day schedule. Project consisted of Selected interior demolition, New interior architectural construction and finishes, HVAC and mechanical work, electrical work, plumbing fixtures and piping, Fire protection and suppression systems. Completed project on-time to the satisafactory of the customer.

Lockheed Martin Aeronautics

Fuel Station Operational Upgrades

​​Contract/PO #

6574018086

​

Type

Construction

​

Modifications to the ventilation systems in Buildings 210,211, and 212, F-35 hydraulic fluid delivery control panels, F-16 hydraulic fluid delivery system in Building 212, Supply and Installation of new hydraulic "top up" systems in Buildings 210,211 and 212.

NASA

Electrical Upgrades to Kennedy Space Center Launch Pad "B"

​Contract/PO #

80KSC017C0024

​

Type

Design Build/ Construction

​

Designed, Constructed, and Installed equipment required to increase the capacity of the Undisrupted Power Supplies, UPS 40 and 41 at Launch Pad-B to a minimum of 600kVA each. The design for the increased UPS capacity and system installation include connectivity to KCCS for remote monitoring of these units and associated breaker status. The design was compliant to manufacturer's system requirements and also included new batteries and condition based on including battery monitoring system and all wiring, conduit, and neccessary equipment.

Defense Information Systems Agency (DISA)

B200 Electrical Capacity Upgrades

​Contract/PO #

W9126G-16-R-0589

​

Type

Design Build/Construction

​

Upgraded the electrical and mechanical infrastructure of Building 200, home to the DISA San Antonio datacenter at 3326 General Hudnell. The existing facility featured dual 13.2kV utility feeds, 2,500kVA transformers, N+1 generator backup, redundant chillers, and 2(N+1) UPS topology. Our scope segregated mechanical loads from critical (UPS) loads by installing new critical distribution switchgear, two new UPS modules and associated switchboards, and two new utility transformers while retiring two legacy UPS units. We also added a fourth emergency generator, new generator paralleling switchgear, and upgraded controls to enable automatic closed-transition operation, significantly enhancing system redundancy, maintainability, and resilience.

U.S Army Corp of Engineers

Randolph Air Force Base Hangars 12 and 64

​Contract/PO #

W9126G16C0023

​

Type

Construction

​

BLD. 64 Demolition of existing metal roof panels of main roof structure and replacement with new steel standing seam metal roof panels, and demolition of existing EPDM corner pocket roofs and replacement with new TPO corner pocket roofs. Facility occupied during construction. Bldg. 12: Demolition of existing metal roof panels of main roof structure and replacement with new steel standing seam metal roof panels, and demolition of existing EPDM corner pocket roofs and replacement with new TPO corner pocket roofs. Facility occupied during construction. Both Hangars were located right off the Base's Air Field creating harsh conditions.

hUCKABAY isd

Ag Science Classrooms / Labs and Animal Barn

​Contract/PO #

​

​

Type

Design Build/Construction

​

Design-build project involving two separate metal building structures totaling over 20,000 square feet.  Ag Science classroom building included space for welding, metal, and wood fabrication labs as well as restrooms.  The Animal Barn provided temperature-controlled pens with automatic watering devices for over forty show animals (with inside and outside access).  The building also offered a practice show arena to train animals and prepare for competitions. 

Texas Historical Commission

Ft. Griffin State Historic Site Additions/Alterations to Visitor Center

​Contract/PO #

808-13-1363 

​

Type

Construction

​

Ground up construction Addition of a $1.2M a new museum gallery building with an exterior architectural canopy roof and a Visitors Facilities Building. Includes exterior improvements and landscape

U.S. Airforce

Multiple Award Construction Contract (MACC) (6 Task Orders)

​Contract/PO #

FA4661-11-D

(5 year MACC)

​

Type

Construction

​

The work requirements to be performed by the contractor consists of, but are not limited to, a broad range of maintenance, repair, minor construction/alteration and renovation work on real property on Dyess Air Force Base, TX. All work shall be in conformance with the requirements of the contract including furnishing all materials, labor, plant, tools, equipment, transportation, supervision, management and other services including engineering/ technical design support, items and incidentals necessary thereto. The work is required in support of the 7th Civil Engineering Squadron, Base Civil Engineering activities.

mineral wells isd

Parking Lot Renovations and Awning Repairs

​Contract/PO #

​

​

Type

Construction

​

Exterior paving work to replace failing parking facilities at multiple campuses.  Project included demo of existing asphalt and concrete spaces, civil engineering, and reinstallation.  Renovated failing aluminum awnings near bus / parent pick-up lines, going to great lengths to ensure cosmetic matched existing awnings in other portions of the campus.  Coordinated with client to secure cost-effective and high-quality local subcontractors for portions of the projects. 

U.S. Airforce

Relocated Overhead to Underground Sheppard AFB

​Contract/PO #

FA3020-13-C-0009 

​

Type

Construction

​

Relocate electrical primary overhead lines and communication lines serving base-housing subdivision to underground duct bank, large pull boxes, manholes, horizontal directional drilling to under highway to DOT specifications. Including re-feeding sport arena type lighting, marque sign, street lighting system, new sector switch, new transformer, leveling utility pad mount vacuum switch, testing, and close out asbuilts.

​Private Oilfield Company

Washita Valley Oil Field Service

​Contract/PO #

13-002-W 

​

Type

Design Build/Construction

​

Excavated 10 acres and fenced 14 acre site for approximately 25, 000 SF of multiple metal buildings, slab on grade, ground-up, including the Office Building, EMI/X-ray Building, “Pipe-Threading” Shed, Bucker Shed, and Straightener Shed. Connecting owner’s equipment, prepping mounting footers and slabs for heavy industrial equipment.

Lockheed Martin Aeronautics

Replace Electrical Substations No. 4 and 5

​Contract/PO #

ACFJ060F08

​

Type

Construction

​

Provide a new electrical substation to replace 69/4.16kV transformers 4 and 5 and associated switchgear located in Main Substation

Lockheed Martin Aeronautics

Lockheed Martin JSF (Joint Strike Fighter) ALIS (Autonomic Logistics Information System) Computer Room Upgrade

​Contract/PO #

7267007

​

Type

Construction

​

Classified/Closed Area with Ongoing Operations/User Occupied/ Upgrade of all electrical and mechanical systems for the main computer/server room for the JSF F-35 Program. The end-users, ALIS, serves as the information infrastructure for the F-35, transmitting aircraft health and maintenance action information to the appropriate users on a globally-distributed network to technicians worldwide with capabilities to support current and future warfighters across the U.S. and allied military services. All systems are critical/fail-safe systems that must have 100% up-time. EMCS,CRAC, UPS, 480V electrical, raised flooring, RDU, EPO systems were all upgraded while in operation. Process required constant scheduling and troubleshooting with Lockheed Martin Engineers and most importantly the F-35 Program/End-users. Project was riddled with changes directed by the owner and was also completed on schedule and within budget.

US Corps of Engineers

Bardwell Restroom Replacement

​Contract/PO #

W9126G-18-C-0126

​

Type

Construction

​

Removed and replaced multiple restroom facilities throughout the Corps' Parks on Bardwell Lake in Ennis, Texas. 

US Corps of Engineers

Lavonia Restroom Replacement

​Contract/PO #

W9126G-18-C-0113

​

Type

Construction

​

Removed and replaced multiple restroom facilities throughout the Corps' "Lavonia Park" on Lake Lavon, near Lavon, Texas.

US Corps of Engineers

Lavon Day Use Restroom Replacement

​Contract/PO #

W9126G-18-C-0012

​

Type

Construction

​

Removed and replaced multiple restroom facilities throughout the Corps' "Day Use Facility" on Lake Lavon, near Lavon, Texas.

Lockheed Martin Aeronautics

HITL Open Air Config. B.214

Contract/PO #

6574028518

​

Type

Construction

​

Renovated and reconfigured secure computer lab for Lockheed Martin Aeronautics' Fort Worth facility.

Lockheed Martin Aeronautics

Lift Fan Hoist RS15 & RS16

​Contract/PO #

6574028549

​

Type

Construction

​

Modification and installation of aircraft hoists and fall protection at active run stations at Lockheed Martin Aeronautics' Fort Worth facility.

Lockheed Martin Aeronautics

F22- Ironbird Facility Upgrade

​Contract/PO #

6574028497

​

Type

Construction

​

Mechanical Piping and electrical upgrades for the F22 Raptor Lab at Lockheed Martin Aeronautics' Fort Worth facility.

Lockheed Martin Aeronautics

Replace Elevator 92C (bldg. 4)

Contract Amount

$737,465.00

​

Contract/PO #

6574029964

​

Type

Construction

​

Remove and replace elevator cab.

Lockheed Martin Aeronautics

Blast Deflectors Run St 4-16

​Contract/PO #

6574030350

​

Type

Construction

​

Installation of ten new F-35 jet blast deflectors on active FOD critical runway ramp. Demolition, excavation, earthwork, concrete, construction, and installation of blast deflectors at Lockheed Martin Aeronautics' Fort Worth facility.

Lockheed Martin Aeronautics

F16 Production Removal PH3

Contract/PO #

6574030791

​

Type

Construction

​

Dismantle and relocate F16 Aircraft production platform at Lockheed Martin Aeronautics' Fort Worth facility.

GCS- Gallagher Construction

Springtown Window Replacement

Contract/PO #

N/A

​

Type

Construction

​

Coordinated and executed successful abatement and demolition of existing windows and frames in forty year old building; renovated existing classrooms including replacement of windows and fixtures. Followed critical schedule timelines in order to complete before FDoS.  

HUNT Electric

Rehab Substation Phase III

Contract/PO #

N/A

​

Type

Construction

​

Staffed project with QC staff on renovation project, acting as sub-contractor in partnership with other vendors.

Lockheed Martin Aeronautics

ManTech Lab Expansion

​Contract/PO #

6574034814

​

Type

Construction

​

Interior remodel of existing factory space to accommodate incoming lab personnel at Lockheed Martin facility.

Lockheed Martin Aeronautics

EMAS Vacuum System Upgrade

​Contract/PO #

6574035533

​

Type

Construction

​

Interior remodel of existing factory space to accommodate incoming owner supplied equipment

Lockheed Martin Aeronautics

Enterprise Integration Phase 2

​Contract/PO #

6574037657

​

Type

Construction

​

Interior remodel of existing factory space to accommodate incoming lab personnel

US Corps of EngineerS

Lewisville Lake Office Repair

​Contract/PO #

C19-109

​

Type

Construction

​

Interior office demolition and remodel/renovation of US Army Corps of Engineers offices at Lake Lewisville.

Lockheed Martin Aeronautics

Compression & Vibration System

​Contract/PO #

6574037751

​

Type

Construction

​

Interior remodel to accommodate owner furnished and installed equipment at Lockheed Martin Aeronautics' Fort Worth facility.

Lockheed Martin Aeronautics

VMS Mounting System Phase 2

​Contract/PO #

6574038462

​

Type

Construction

​

Installation of Visual Management System board supports on F35 Final production line at Lockheed Martin Aeronautics' Fort Worth facility.

Lockheed Martin Aeronautics

F-16 Block 60 (DMS)

​Contract/PO #

6574038863

​

Type

Construction

​

Remodel of Computer lab Lockheed Martin

Lockheed Martin Aeronautics

UPS For Mission System Lab

Contract/PO #

6574038809

​

Type

Construction

​

Battery back up installations

Lockheed Martin Aeronautics

J860 Countersink Robot

Contract/PO #

6574040175

​

Type

Construction

​

Floor slab replacement to accommodate owner furnished and installed equipment

Lockheed Martin Aeronautics

Replace Clarifier Bldg. 5

Contract/PO #

6574042577

​

Type

Construction

​

Remove and replace owner supplied equipment.

Lockheed Martin Aeronautics

Refinish Environmental Chamber

​Contract/PO #

6574042695

​

Type

Construction

​

Sandblast and paint existing room at plant.

GCC Enterprises

Waylon Headrick Super Labor

Contract/PO #

N/A

​

Type

Construction

​

Supplied construction superintendent support. Acted as sub-contractor

Springtown ISD

SIS Ag Shop Renovations

​Contract/PO #

N/A

​

Type

Construction

​

Interior remodel of former Ag Science workshop area in an occupied elementary school. Demolition, drywall, plumbing, millwork, tile work and paint allowed campus to then utilize what had been storage space as new Choir classroom and office space.

Peaster ISD

Middle School Window & Door

​Contract/PO #

N/A

​

Type

Construction

​

Small interior remodel in occupied middle school

Lockheed Martin Aeronautics

IRT Automated PSA Application

​Contract/PO #

6574045015

​

Type

Construction

​

Installation of new mechanical and electrical systems for new PSA Application Equipment

Lockheed Martin Aeronautics

ManTech Lab Expansion

​​Contract/PO #

6574045173

​

Type

Construction

​

Interior remodel of existing factory space to accommodate incoming lab personnel

Lockheed Martin Aeronautics

Final Assembly C-Aisle

​Contract/PO #

6574045473

​

Type

Construction

​

Compressed air and electrical modifications on active assembly line, FOD critical areas.

Lockheed Martin Aeronautics

Run Station 9 & 12 East Pavement

​Contract/PO #

6574030350

​

Type

Construction

​

Removed and replaced active runway ramp concrete.

Lockheed Martin Aeronautics

FAD 1 & FAD2 UPS Installation

​Contract/PO #

6574045503

​

Type

Construction

​

Battery back up installations

US Corps of Engineers

Lewisville Office Build-Out

​Contract/PO #

20-133

​

Type

Construction

​

Interior office demolition and remodel of USACE Lake Construction office.

US Corps of Engineers

Bardwell Pole Barn

​Contract/PO #

W9126G-20-C-0067

​

Type

Construction

​

New ground up construction of PEMB metal structure amd surrounding flatwork.

US Corps of Engineers

Lavon Site Work

​Contract/PO #

W9126G20R0078

​

Type

Construction

​

Pavement removal and replacement.

US Corps of Engineers

Grapevine Office Renovation

​Contract/PO #

W9126G-20-C-0043

​

Type

Construction

​

Bathroom renovations to USACE Grapevine Lake Office

US Corps of Engineers

Lewisville Paving

​​Contract/PO #

W9126G20R0104

​

Type

Construction

​

USACE Lewisville Lake Pavement removal, Subgrade treatment, Rock base installation, Asphalt paving, Concrete curb and gutter and concrete paving.

Lockheed Martin Aeronautics

Refurbishment of Bldg. 189

​Contract/PO #

6574046587

​

Type

Construction

​

Construct new observation room in existing structure.

Lockheed Martin Aeronautics

Lockheed Martin BLDG 200

Contract/PO #

6574051048

​

Type

Construction

​

Refurbishment of office and conference rooms in Building 002 Floor 1. Critical Schedule
Project 12,000 SQ feet of office refurbishment. Project consisted of Selected interior
demolition, New interior architectural construction and finishes, HVAC and mechanical work, electrical work, plumbing fixtures and piping, Fire protection, and suppression systems. Complying with high-security requirements.

Springtown ISD

Springtown Art Room

​Contract/PO #

N/A

​

Type

Construction

​

Interior remodel of classroom art area in a occupied elementary school. Demolition, drywall, plumbing, millwork, tile work and paint.

ALVORD ISD

Addition to Alvord HS Ag Science Building

​Contract/PO #

N/A

​

Type

Construction Manager

​

Modifications to an existing Ag Science facility and construction of a similar PEMB addition of approximately 2,00 square feet of new lab space for welding/shop program.  Work included finishing, plumbing, mechanical, electrical, concrete foundation, and fire alarm system.

Lockheed Martin Aeronautics

Lockheed Martin On call

​Contract/PO #

6574051197

​

Type

Construction

​

Three year - 24/7 Fort Worth plant-wide service contract (2021 to 2024). Initial projects include remodel/renovation of office areas and minor demolition services while working diligently to accommodate need for continual access by Lockheed employees (at Lockheed Martin Aeronautics' Fort Worth facility).

​​Our reputation in the industry includes that we always put clients first...and we always will. This central tenet has been important to us since day one.  We are proud of the fact that more than 40% of our private contracts have been negotiated with repeat customers, and more than 25% of our work has been from referrals. Listening to your needs and requirements, honoring your budget, and producing exceptional results is something we excel in.

image4.jpeg

Commercial Construction

 

At NAE Contracting, our team of experts take pride in their work offering a quality that is second to none. We truly enjoy the unique challenges that each that each project presents and are proud of the results we have achieved. We invite you to view the gallery below and witness first hand why we are the best commercial construction company in the North Texas region. For more information, you can contact us here via our web form with any questions you may have.

​

Check out the latest on our Facebook page.

bottom of page